Citation: | He Jiayong Wu Jianping Wang Weilaicom sh advance. 2010: Data service system for China Seismic Array. Acta Seismologica Sinica, 32(4): 490-494. |
Wang Zhiyu, Hao Chunyue. 2023: Magnitude measurement and explosive yield estimate using the data of Hailar seismic array. Acta Seismologica Sinica, 45(6): 1079-1090. DOI: 10.11939/jass.20220080 | |
Li Caihua, Teng Yuntian, Zhou Jianchao, Hu Xingxing, Wang Xizhen, Li Xiaojun, Wang Yushi. 2022: Design on high-precision time-synchronization system for distributed seismic data acquisition. Acta Seismologica Sinica, 44(6): 1111-1120. DOI: 10.11939/jass.20210124 | |
Liu Xuzhou, Zhang Yuansheng, Li Shuncheng. 2014: Data rapid integration of mobile seismic array. Acta Seismologica Sinica, 36(4): 730-737. DOI: 10.3969/j.issn.0253-3782.2014.04.018 | |
Lin Guoliang Wang Jian hr. 2012: Compilation of Chinese historical earthquake data by building up a database system based on seismic intensity points. Acta Seismologica Sinica, 34(1): 118-124. | |
2010: 震源参数对强地面震动模拟结果的影响 . Acta Seismologica Sinica, 32(1): 51-59. |
|
1. |
陈钰鑫,李平,高志寅,田兆阳,薄景山,李孝波. 基于地脉动数据的北川老县城河谷场地效应研究. 振动与冲击. 2025(06): 254-262 .
![]() |